Flying in its ‘Block I’ configuration, with four Space Shuttle-era Main Engines, a pair of five-segment Solid Rocket Boosters and a Delta-derived interim Cryogenic Propulsion System (iCPS), the first flight of the Space Launch System (SLS) in December 2017 will despatch the first crew-capable vehicle to the Moon since the Apollo era. Image Credit: [...]
No comments:
Post a Comment